Tuesday, 10 March 2009

filming.

yesterday we did the filming for our film.
the 4 of us went to redhills cromwell estate to film for media. we all came in the appropriate costumes and had our props with us. in total we were filming for around 2 and a half hours. we managed to make sure that we did every scene 2 to 3 times so that we had a choice of which one looked best, so it could be put into the film.

our last scene was the most dangerous, as we had to film one of us being run over by jakes car. we attempted this twice. first time we planned to hit the person being run over at around 5 mph, so that we could speed it up in the final cut programe. this is hard as the person had to run even slower because of the speeding up process, so on the second shot we did it at about 10mph, this worked fine.
The filming was cut up,, and done by each of us at one point. most of the filming was done by beth, who handled the role very well. the acting was mainly left up to jake, josh and myself. we also did small bits of filming as well, but mainly just decided with what shots and how we should film, along with beth.

No comments: